I ran a job over the weekend (run-1b450464 in the earthmover-devs workspace). This job was started with --interactive and was terminated locally but kept running on coiled. Fortunately, I checked the dashboard on and saw that it was still running.
Is there someway to put a max lifetime or idle cull behavior on jobs like this?