Skip to content

Run CodeQL

Run CodeQL #479

Triggered via schedule July 31, 2026 00:35
Status Cancelled
Total duration 15m 33s
Artifacts

codeql.yml

on: schedule
Matrix: Analyze
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 3 warnings
Analyze (javascript)
The job has exceeded the maximum execution time of 15m0s
Analyze (cpp)
The job has exceeded the maximum execution time of 15m0s
Analyze (cpp)
The operation was canceled.
Analyze (javascript)
Failed to save: Unable to reserve cache with key codeql-overlay-base-database-1-55d5a775d041ff38-javascript-2.26.2-c8e2a824002ea6ca1a4e0d6ee465a9ca399cc0c7-30593992350-1, another job may be creating this cache.
Analyze (javascript)
You've hit a rate limit, your rate limit will reset in 29 seconds
Analyze (cpp)
Cannot build an overlay-base database because build-mode is set to "undefined" instead of "none". Falling back to creating a normal full database instead.